Skip to main content
BluINFO

2025 BluBOX Product Lifecycle and Lead-Time Transparency Report

“No More ‘Out of Stock’ Surprises — Ever.”
A Complete, Integrator-Ready Guide to Product Availability, Lifecycle Status & Supply Predictability


Introduction — Why This Report Matters

Across the security industry, integrators cite one frustration above all others: unpredictable product availability.

Backorders, unpublished end-of-life notices, surprise lead times, and inconsistent shipping destroy project schedules, cause customer embarrassment, and erase profit margins.

BluBØX solves this with total transparency:

  • Clear product lifecycle status

  • Published lead times

  • Predictable availability

  • Cloud-first architecture that reduces hardware dependency

This report gives integrators everything they need to plan confidently — no guessing, no surprises, no excuses.


Section 1 — Lifecycle Definitions

A simple system that eliminates ambiguity.

Every BluBØX hardware product falls into one of four lifecycle stages:

Active
Full production, full support, recommended for all new deployments.

Supported
Manufactured or stocked; supported for existing deployments.
Ideal for expansions or legacy-matching installations.

Limited Availability
Tight supply or scheduled phase-out. Available only for approved projects.

End-of-Life (EOL)
No longer manufactured; upgrade paths recommended.
EOL hardware remains supported under BluCARE.

BluBØX Advantage:
Because BluSKY is cloud-native, system functionality continues even when hardware cycles evolve — reducing lifecycle risk.


Section 2 — 2025 Product Lifecycle Table

A. Controllers (ARC Series)

Product Lifecycle Lead Time Notes
ARC-1 Active 2–4 weeks Standard controller, widely deployed
ARC-2 Active 3–6 weeks High-performance; ideal for elevators and enterprise access
ARC-4 Active 3–6 weeks Advanced multi-I/O edge device

Integrator Benefit:
ARC controllers remain stable with predictable production and no planned 2025 discontinuations.


B. Person Readers (PRX / LTS Series)

Product Lifecycle Lead Time Notes
PRX-LT Series Active 4–8 weeks Multi-authentication (face, mobile, card, QR)
PRX-XL Supported 4–6 weeks High-traffic lobbies
Legacy Models EOL N/A Supported for installed base; upgrade path available

2025 Trend:
Demand rising 20–35%. Priority allocation for certified integrators.


C. Readers / Door Hardware

Product Lifecycle Lead Time Notes
BluID/BluREMOTE Readers Active 2–4 weeks Ideal for mobile + card
HID-Compatible BPN2/BPN1 Supported 4–6 weeks Required for certain OEM kiosks
Legacy HID / Third-Party Readers Limited 4–10 weeks Market-wide variability

Industry Context:
BluID solutions reduce dependency on volatile HID supply chains.


D. Cameras (AVMS Ecosystem)

Camera Type Lifecycle Lead Time Notes
ONVIF IP Cameras Active 2–5 weeks Stable supply
AI-Ready Cameras Active 3–6 weeks Pre-qualified for SceneIT, AutoLabel, RaceTrack
Legacy Cameras Limited Varies Supported but not recommended

Integrator Note:
Use BluBØX’s recommended camera list for optimal AI performance.


E. Elevator Components (DDE Integrations)

Product Lifecycle Lead Time Notes
DDE Relay Boards (ARC-2) Active 3–6 weeks Primary DDE integration path
OEM Panels Supported Varies Manufacturer-dependent
Legacy Serial Interfaces EOL N/A Upgrade required

Industry Insight:
OEM elevator hardware lead times are long; ARC reduces dependency.


Section 3 — 2025 Lead-Time Forecast

What integrators can expect this year:

  • Controllers: Stable

  • Person Readers: Demand increasing; Q3/Q4 may tighten

  • Cameras: Stable; AI-ready models preferred

  • Elevator I/O: Plan early due to OEM cycles

  • Mobile Credentials: Instant delivery

  • Accessories: Stable, 1–3 weeks

AI Impact:
Accelerating AI adoption is increasing demand for Person Readers and AI-ready cameras. BluBØX has expanded procurement to prevent shortages.


Section 4 — Supply Predictability Guarantees

BluBØX policies that eliminate integrator risk:

  • Guaranteed Allocation for certified partners

  • 90-Day Forecast Visibility

  • Zero Hidden EOL Decisions

  • Priority Replacement & RMA Stock

  • Cloud-Driven Lifecycle Stability

Predictability becomes a strategic advantage.


Section 5 — How Integrators Use This Report to Win Jobs

Transparency gives integrators a competitive edge:

  • Bid confidently

  • Reduce risk buffers

  • Accelerate deployment timelines

  • Avoid customer-facing delays

  • Prevent integration-breaking surprises

  • Eliminate callbacks caused by late hardware

Better predictability = better projects = happier clients.


Section 6 — Sample Project Planning Template

Include a one-page planner with:

  • Hardware list

  • Lifecycle status

  • Lead time

  • Install date

  • AI readiness

  • Risk score

  • Mitigation plan

A repeatable planning workflow for every BluBØX deployment.


Final Section — Call to Action

Build Better Projects With Transparent, Predictable Supply.

Download the 2025 Product Lifecycle & Lead-Time Transparency Report (PDF)


If you’d like, I can turn this into a formatted PDF layout, a 2-page executive summary, or an infographic-style lifecycle map.

  • Was this article helpful?